| Main
Experiences-Engineering Design(Public Work) |
| No. |
Project
name |
Scale |
Owner
and location |
Completion |
| 1 |
Air
compressor shack rebuilt for phenol acetone plant |
15000Nm3/min |
Shanghai Gaoqiao Petrochemical |
2005 |
| 2 |
electrical
system hidden trouble solving |
35KV |
Shanghai Gaoqiao Petrochemical |
2005 |
| 3 |
Centralized heat supply |
53.6
sq. km |
Suzhou Industry Park Heat
Supply Co. |
2005 |
| 4 |
Oxidation
electric renew |
6KV |
Shanghai Petrochemical Co.,Ltd |
2005 |
| 5 |
Air
separation transformer station electric renew |
7KV |
Shanghai Petrochemical Co.,Ltd |
2005 |
| 6 |
Raw waste water treatment
for Shell |
Industrial
waste water:3800m3/h
Sewage:500m3/h |
Guangdong
Nanhai Petrochemical Co., Ltd. |
2005 |
| 7 |
Centralize
nitrogen supply and air supply phase 2 |
|
Shanghai Gaoqiao Petrochemical |
2005 |
| 8 |
Sulfur
recycling and circulating water tower unit |
Sulfur
recycling:
25KTA
Circulating water:
8.1KTA |
Tecnicas
Reunidas,S.A.and Eurocontrol,S.A., Spain |
2005 |
| 9 |
Sewage disposal |
15600m3/h |
SINOPEC
Hainan Refinery Co., Ltd. |
2004 |
| 10 |
Distribution
network automation |
34KV |
Shanghai Gaoqiao Petrochemical |
2004 |
| 11 |
Air
Separation |
42000Nm3/h |
Shanghai Petrochemical Co.,Ltd |
2004 |
| 12 |
Centralized heat supply |
52
sq. km |
Zhejiang Hengyang
Pyroelectricity Co. |
2004 |
| 13 |
Sludge
system reconstruction |
61t/h |
Shanghai Petrochemical Co.,Ltd |
2004 |
| 14 |
Drossy
oil main substation safe power supply reconstruction |
6KV、35KV |
Shanghai Petrochemical Co.,Ltd |
2004 |
| 15 |
Oily sewage expansion
treatment |
1200m3/h |
Shanghai Petrochemical Co.,Ltd |
2003 |
| 16 |
Air
Separation |
2×104
Nm3/h |
Shanghai
Risuan Gas Co., Ltd. |
2003 |
| 17 |
Air compression station |
3*11400Nm3/h |
Shanghai SECCO Co., Ltd. |
2003 |
| 18 |
OSBL high voltage
transformer station |
3*35/6KV |
Shanghai SECCO Co., Ltd. |
2003 |
| 19 |
Sewage disposal |
900m3/h |
Shanghai SECCO Co., Ltd. |
2003 |
| 20 |
Carbon black tailgas |
3600(m3/h) |
Shanghai CABOT Chemical Ltd. |
2001 |
| 21 |
Sewage disposal |
7000t/d |
Shanghai
Chemical Industry Park Developing Co., Ltd. |
2001 |
| 22 |
Oily sewage treatment |
1200t/h |
Shanghai Petrochemical Co.,Ltd |
2000 |
| 23 |
Oxygen
air separation |
1.5×104
NM3/h |
Shanghai Petrochemical Co.,Ltd |
1999 |
| 24 |
Wet oxidation treatment of waste alkali
liquor |
16
t/h |
Shanghai Petrochemical Co.,Ltd |
1999 |
| 25 |
Living
garbage burning plant |
365KTA |
Shanghai
Pucheng Pyroelectricity Energy Co., Ltd. |
1999 |
| 26 |
Sludge treatment for rock
cave entrance |
500t/d |
Shanghai
Municipal Design Research Institute |
1999 |
| 27 |
Garbage burning |
1100
t/d |
Beijing
Lishuiqiao Refuse Insinerate Plant |
1998 |
| 28 |
Sewage disposal for PET
equipment |
250
KTA |
Suzhou
Dupont (China) Co., Ltd. |
1998 |
| 29 |
Sewage disposal for beer
production |
3300m3/d |
Shanghai Suntory Co., Ltd |
1998 |
| 30 |
Sewage disposal |
3500M3/d |
Wuxi
Zhongya Chemical Co., Ltd. |
1998 |
| 31 |
Centralized
heat supply |
8
sq. km |
Centralized
heat supply of Singapore Industrail zone |
1998 |
| 32 |
Heat supply |
26
sq. km |
Wuxi Xielian
Pyroelectricity Co. |
1997 |
| 33 |
Sewage disposal |
3KTA |
shanghai
Armstrong Architecture Product Co., Ltd. |
1997 |
| 34 |
High
voltage transformer station of delayed coking combination unit |
35/6KV |
Shanghai Petrochemical Co.,Ltd |
1997 |
| 35 |
Heat
Net Project |
7
sq. km |
Shanghai Waigaoqiao
Thermodynamics Co. |
1997 |
| 36 |
Thermodynamics
Station for GM |
83000KW |
Shanghai Meiya Jinqiao Fuel
Co. |
1997 |
|
|
|
|
|